The AS Monaco Performance Center
With its Performance Center, AS Monaco is equipped with an ultra-modern facility dedicated to excellence. Discover everything there is to know about the professional squad’s new home.
A place dedicated to performance
The Performance Center fulfills President Rybolovlev’s ambition—formed immediately upon taking the helm of the Club—to equip AS MONACO with a state-of-the-art training facility designed for both the present and the future. His aim is to provide the professional squad with optimal conditions, enabling them to achieve a level of performance commensurate with the Club’s ambitious sporting project.
Inspired by Europe’s most modern training complexes—notably that of Tottenham, following numerous preliminary visits—the Performance Center is built upon AS MONACO’s three pillars of performance: training, nutrition, and recovery.
Situated in a highly constrained site, the entire project was spearheaded by AS MONACO’s Operations Team and conceived collaboratively with local authorities, architect Frédéric Genin, and the firm ARCH Monaco.
Key figures
-
12.000 Square metres of built space in the new facility
-
280 Seats in the stand adjoining the first training pitch
-
55 Millions of euros invested
-
3 Pitches, including one certified by the FFF/UEFA
-
5 Hectares of developed space
-
7 Floors dedicated to the first team
Chronology
- June 2018: Start of construction work
- May 2019: Installation of the first foundations
- June 2021: Handover of the first phase of infrastructure and keys to AS Monaco
- September 2022: Complete handover of the Performance Center